2014年6月12日星期四

PMI-002 Exam Cost, PMI-RMP VCE Dumps

The PMI PMI-002 certification exam is not only validate your skills but also prove your expertise. It can prove to your boss that he did not hire you in vain. The current IT industry needs a reliable source of PMI PMI-002 certification exam, Pass4Test is a good choice. Select Pass4Test PMI-002 exam material, so that you do not need yo waste your money and effort. And it will also allow you to have a better future.

Pass4Test's PMI PMI-RMP exam training material is the best training materials on the Internet. It is the leader in all training materials. It not only can help you to pass the exam , you can also improve your knowledge and skills. Help you in your career in your advantage successfully. As long as you have the PMI PMI-RMP certification, you will be treated equally by all countries.

After you used Pass4Test PMI PMI-RMP dumps, you still fail in PMI-RMP test and then you will get FULL REFUND. This is Pass4Test's commitment to all candidates. What's more, the excellent dumps can stand the test rather than just talk about it. Pass4Test test dumps can completely stand the test of time. Pass4Test present accomplishment results from practice of all candidates. Because it is right and reliable, after a long time, Pass4Test exam dumps are becoming increasingly popular.

PMI-002Exam Code: PMI-002
Exam Name: Certified Associate in Project Management (CAPM) Certification
One year free update, No help, Full refund!
PMI-002 Study Guide Total Q&A: 748 Questions and Answers
Last Update: 2014-06-12

PMI-002 Study Guide Detail : Click Here

 
PMI-RMPExam Code: PMI-RMP
Exam Name: PMI Risk Management Professional
One year free update, No help, Full refund!
PMI-RMP Real Dumps Total Q&A: 273 Questions and Answers
Last Update: 2014-06-12

PMI-RMP Dumps PDF Detail : Click Here

 

Pass4Test's PMI PMI-002 exam training materials not only can save your energy and money, but also can save a lot of time for you. Because the things what our materials have done, you might need a few months to achieve. So what you have to do is use the Pass4Test PMI PMI-002 exam training materials. And obtain this certificate for yourself. Pass4Test will help you to get the knowledge and experience that you need and will provide you with a detailed PMI PMI-002 exam objective. So with it, you will pass the exam.

Pass4Test PMI PMI-002 exam training materials praised by the majority of candidates is not a recent thing. This shows Pass4Test PMI PMI-002 exam training materials can indeed help the candidates to pass the exam. Compared to other questions providers, Pass4Test PMI PMI-002 exam training materials have been far ahead. uestions broad consumer recognition and reputation, it has gained a public praise. If you want to participate in the PMI PMI-002 exam, quickly into Pass4Test website, I believe you will get what you want. If you miss you will regret, if you want to become a professional IT expert, then quickly add it to cart.

People from all walks of life all work hard for the future. You must work hard to upgrade your IT skills. Then, do you have obtained PMI PMI-RMP certificate which is very popular? How much do you know about PMI-RMP test? If you want to pass PMI-RMP exam without enough exam related knowledge, how should you do? But don't you worry: Pass4Test will give assistance to you.

There are a lot of sites provide the PMI PMI-002 exam certification and other training materials for you . Pass4Test is only website which can provide you PMI PMI-002 exam certification with high quality. In the guidance and help of Pass4Test, you can through your PMI PMI-002 exam the first time. The questions and the answer provided by Pass4Test are IT experts use their extensive knowledge and experience manufacturing out . It can help your future in the IT industry to the next level.

PMI-RMP Free Demo Download: http://www.pass4test.com/PMI-RMP.html

NO.1 Jenny is the project manager for the NBT projects. She is working with the project team and several
subject matter experts to perform the quantitative risk analysis process. During this process she and the
project team uncover several risks events that were not previously identified. What should Jenny do with
these risk events?
A. The events should be entered into qualitative risk analysis.
B. The events should be determined if they need to be accepted or responded to.
C. The events should be entered into the risk register.
D. The events should continue on with quantitative risk analysis.
Answer: C

PMI Free download   PMI-RMP test questions   PMI-RMP test   PMI-RMP

NO.2 You work as the project manager for Bluewell Inc. Your project has several risks that will affect several
stakeholder requirements. Which project management plan will define who will be available to share
information on the project risks?
A. Risk Management Plan
B. Stakeholder management strategy
C. Resource Management Plan
D. Communications Management Plan
Answer: D

PMI Study Guide   PMI-RMP answers real questions   PMI-RMP   PMI-RMP Exam Questions   PMI-RMP exam

NO.3 You are working with Anna on your project to determine and map the probability distributions of risk
within the project. You have indicated that you will use the uniform distribution method for a portion of the
project. Which part of your project is most likely to have a uniform risk distribution?
A. Late completion stages of a project
B. Project phases that deal with "cutover" technologies
C. Early concept stage of design
D. Project initiating
Answer: C

PMI Exam Questions   PMI-RMP practice test   PMI-RMP questions   PMI-RMP

NO.4 You are the project manager of the GYH project for your organization. Management has asked you to
begin identifying risks and to use an information gathering technique. Which one of the following risk
identification approaches is an information gathering technique?
A. Root cause analysis
B. Assumptions analysis
C. SWOT analysis
D. Documentation reviews
Answer: A

PMI   PMI-RMP Exam Dumps   PMI-RMP certification   PMI-RMP   PMI-RMP exam

NO.5 Tracy is the project manager of the NLT Project for her company. The NLT Project is scheduled to last
14 months and has a budget at completion of $4,555,000. Tracy's organization will receive a bonus of
$80,000 per day that the project is completed early up to $800,000. Tracy realizes that there are several
opportunities within the project to save on time by crashing the project work. Crashing the project is what
type of risk response?
A. Transference
B. Mitigation
C. Exploit
D. Enhance
Answer: D

PMI Test Questions   PMI-RMP test answers   PMI-RMP pdf   PMI-RMP   PMI-RMP demo

NO.6 You are the project manager of the NHQ Project for your company. You have completed qualitative and
quantitative analysis of your identified project risks and you would now like to find an approach to increase
project opportunities and to reduce threats within the project. What project management process would
best help you?
A. Monitor and control project risks
B. Create a risk governance approach
C. Create the project risk register
D. Plan risk responses
Answer: D

PMI Exam Questions   PMI-RMP Exam Cost   PMI-RMP Exam Cram   PMI-RMP Practice Test   PMI-RMP Exam PDF

NO.7 John works as a project manager for ABD project. He and his team, are working on the following
activities:
Relative ranking or priority list of project risks
Watchlists of low priority risk
Trends in Qualitative Risk Analysis results
On which of the following processes is John working on?
A. Perform Qualitative Risk Analysis
B. Plan Risk Management
C. Plan Risk Responses
D. Perform Quantitative Risk Analysis
Answer: A

PMI test   PMI-RMP   PMI-RMP Exam Cram   PMI-RMP Actual Test   PMI-RMP exam

NO.8 Lisa is the project manager of the SQL project for her company. She has completed the risk response
planning with her project team and is now ready to update the risk register to reflect the risk response.
Which of the following statements best describes the level of detail Lisa should include with the risk
responses she has created?
A. The level of detail is set by historical information.
B. The level of detail should correspond with the priority ranking.
C. The level of detail must define exactly the risk response for each identified risk.
D. The level of detail is set of project risk governance.
Answer: B

PMI   PMI-RMP practice test   PMI-RMP Test Answers   PMI-RMP braindump

2014年3月28日星期五

Pass4Test provides information on the latest PMI PMI-RMP examination training

When we started offering PMI PMI-RMP exam questions and answers and exam simulator, we did not think that we will get such a big reputation. What we are doing now is incredible form of a guarantee. Pass4Test guarantee passing rate of 100%, you use your PMI PMI-RMP exam to try our PMI PMI-RMP training products, this is correct, we can guarantee your success.

Pass4Test's PMI PMI-RMP exam training materials is virtually risk-free for you at the time of purchase. Before you buy, you can enter Pass4Test website to download the free part of the exam questions and answers as a trial. So you can see the quality of the exam materials and we Pass4Testis friendly web interface. We also offer a year of free updates. If you do not pass the exam, we will refund the full cost to you. We absolutely protect the interests of consumers. Training materials provided by Pass4Test are very practical, and they are absolutely right for you. We can make you have a financial windfall.

PMI PMI-RMP is a certification exam to test IT expertise and skills. If you find a job in the IT industry, many human resource managers in the interview will reference what PMI related certification you have. If you have PMI PMI-RMP certification, apparently, it can improve your competitiveness.

Now passing PMI certification PMI-RMP exam is not easy, so choosing a good training tool is a guarantee of success. Pass4Test will be the first time to provide you with exam information and exam practice questions and answers to let you be fully prepared to ensure 100% to pass PMI certification PMI-RMP exam. Pass4Test can not only allow you for the first time to participate in the PMI certification PMI-RMP exam to pass it successfully, but also help you save a lot of valuable time.

Exam Code: PMI-RMP
Exam Name: PMI (PMI Risk Management Professional)
One year free update, No help, Full refund!
Total Q&A: 273 Questions and Answers
Last Update: 2014-03-28

PMI-RMP Free Demo Download: http://www.pass4test.com/PMI-RMP.html

NO.1 Tracy is the project manager of the NLT Project for her company. The NLT Project is scheduled to last
14 months and has a budget at completion of $4,555,000. Tracy's organization will receive a bonus of
$80,000 per day that the project is completed early up to $800,000. Tracy realizes that there are several
opportunities within the project to save on time by crashing the project work. Crashing the project is what
type of risk response?
A. Transference
B. Mitigation
C. Exploit
D. Enhance
Answer: D

PMI   PMI-RMP test questions   PMI-RMP dumps   PMI-RMP braindump   PMI-RMP test questions

NO.2 John works as a project manager for ABD project. He and his team, are working on the following
activities:
Relative ranking or priority list of project risks
Watchlists of low priority risk
Trends in Qualitative Risk Analysis results
On which of the following processes is John working on?
A. Perform Qualitative Risk Analysis
B. Plan Risk Management
C. Plan Risk Responses
D. Perform Quantitative Risk Analysis
Answer: A

PMI dumps   PMI-RMP   PMI-RMP   PMI-RMP

NO.3 You are preparing to start the qualitative risk analysis process for your project. You will be relying on
some organizational process assets to influence the process. Which one of the following is NOT a
probable reason for relying on organizational process assets as an input for qualitative risk analysis?
A. Studies of similar projects by risk specialists
B. Risk databases that may be available from industry sources
C. Review of vendor contracts to examine risks in past projects
D. Information on prior, similar projects
Answer: C

PMI braindump   PMI-RMP dumps torrent   PMI-RMP pdf   PMI-RMP dumps torrent   PMI-RMP

NO.4 You are a risk auditor for your company. You are reviewing the contract types a project manager has
used in her project. Of the following, which contract type has the most risk for the project manager as a
buyer?
A. Cost plus percentage of costs
B. Time and material
C. Cost plus incentive fee
D. Fixed-price, incentive fee
Answer: A

PMI   PMI-RMP answers real questions   PMI-RMP

NO.5 You work as a project manager for BlueWell Inc. Your project is using a new material to construct a large
warehouse in your city. This new material is cheaper than traditional building materials, but it takes some
time to learn how to use the material properly. You have communicated to the project stakeholders that
you will be able to save costs by using the new material, but you will need a few extra weeks to complete
training to use the materials. This risk response of learning how to use the new materials can also be
known as what term?
A. Team development
B. Benchmarking
C. Cost of conformance to quality
D. Cost-benefits analysis
Answer: C

PMI study guide   PMI-RMP exam   PMI-RMP exam   PMI-RMP   PMI-RMP demo

NO.6 Jenny is the project manager for the NBT projects. She is working with the project team and several
subject matter experts to perform the quantitative risk analysis process. During this process she and the
project team uncover several risks events that were not previously identified. What should Jenny do with
these risk events?
A. The events should be entered into qualitative risk analysis.
B. The events should be determined if they need to be accepted or responded to.
C. The events should be entered into the risk register.
D. The events should continue on with quantitative risk analysis.
Answer: C

PMI dumps torrent   PMI-RMP   PMI-RMP dumps torrent   PMI-RMP dumps

NO.7 Jane is the project manager of the GBB project for her company. In the current project a vendor has
offered the project a ten percent discount based if they will order 100 units for the project. It is possible
that the GBB Project may need the 100 units, but the cost of the units is not a top priority for the project.
Jane documents the offer and tells the vendor that they will keep the offer in mind and continue with the
project as planned. What risk response has been given in this project?
A. Acceptance
B. Enhance
C. Exploiting
D. Sharing
Answer: A

PMI   PMI-RMP   PMI-RMP questions   PMI-RMP   PMI-RMP   PMI-RMP practice test

NO.8 You are working with Anna on your project to determine and map the probability distributions of risk
within the project. You have indicated that you will use the uniform distribution method for a portion of the
project. Which part of your project is most likely to have a uniform risk distribution?
A. Late completion stages of a project
B. Project phases that deal with "cutover" technologies
C. Early concept stage of design
D. Project initiating
Answer: C

PMI   PMI-RMP original questions   PMI-RMP   PMI-RMP

NO.9 You are the project manager of the GHE Project. You have identified the following risks with the
characteristics as shown in the following figure: How much capital should the project set aside for the risk
contingency reserve?
A. $142,000
B. $41,750
C. $23,750
D. $232,000
Answer: C

PMI   PMI-RMP practice test   PMI-RMP pdf   PMI-RMP

NO.10 You work as a project manager for BlueWell Inc. You want to create a visual diagram, which can depict
the resources that will be used within the project. Which of the following diagrams will you create to
accomplish the task?
A. Roles and responsibility matrix
B. Work breakdown structure
C. Resource breakdown structure
D. RACI chart
Answer: C

PMI exam dumps   PMI-RMP certification   PMI-RMP study guide   PMI-RMP

NO.11 You are project manager for ABD project. You, with your team, are working on the following activities:
Probabilistic analysis of a project.
Probability of achieving cost and time objectives.
Trends in Qualitative Risk Analysis results.
On which of the following processes are you working on?
A. Plan Risk Management
B. Perform Quantitative Risk Analysis
C. Perform Qualitative Risk Analysis
D. Identify Risks
Answer: B

PMI   PMI-RMP practice test   PMI-RMP

NO.12 Virginia is the project manager for her organization. She has hired a subject matter expert to interview
the project stakeholders on certain identified risks within the project. The subject matter expert will assess
the risk event with what specific goal in mind?
A. To determine the level of probability and impact for each risk event
B. To determine the bias of the risk event based on each person interviewed
C. To determine the probability and cost of the risk event
D. To determine the validity of each risk event
Answer: A

PMI demo   PMI-RMP   PMI-RMP

NO.13 Frank is the project manager of the NHQ project for his company. Frank is working with the project
team, key stakeholders, and several subject matter experts on risks dealing with the new materials in the
project. Frank wants to utilize a risk analysis method that will help the team to make decisions in the
presence of the current uncertainty surrounding the new materials. Which risk analysis approach can
Frank use to create an approach to make decisions in the presence of uncertainty?
A. Monte Carlo Technique
B. Qualitative risk analysis process
C. Quantitative risk analysis process
D. Delphi Technique
Answer: C

PMI certification   PMI-RMP dumps   PMI-RMP dumps

NO.14 Lisa is the project manager of the SQL project for her company. She has completed the risk response
planning with her project team and is now ready to update the risk register to reflect the risk response.
Which of the following statements best describes the level of detail Lisa should include with the risk
responses she has created?
A. The level of detail is set by historical information.
B. The level of detail should correspond with the priority ranking.
C. The level of detail must define exactly the risk response for each identified risk.
D. The level of detail is set of project risk governance.
Answer: B

PMI   PMI-RMP   PMI-RMP exam prep   PMI-RMP exam dumps

NO.15 Sammy is the project manager for her organization. She would like to rate each risk based on its
probability and affect on time, cost, and scope. Harry, a project team member, has never done this before
and thinks Sammy is wrong to attempt this approach. Harry says that an accumulative risk score should
be created, not three separate risk scores. Who is correct in this scenario?
A. Harry is correct, because the risk probability and impact considers all objectives of the project.
B. Harry iscorrect, the risk probability and impact matrix is the only approach to risk assessment.
C. Sammy is correct, because organizations can create risk scores for each objective of the project.
D. Sammy is correct, because she is the project manager.
Answer: C

PMI demo   PMI-RMP   PMI-RMP test questions   PMI-RMP pdf   PMI-RMP

NO.16 Kelly is the project manager of the BHH project for her organization. She is completing the risk
identification process for this portion of her project. Which one of the following is the only thing that the
risk identification process will create for Kelly?
A. Risk register
B. Risk register updates
C. Change requests
D. Project document updates
Answer: A

PMI test answers   PMI-RMP   PMI-RMP certification   PMI-RMP   PMI-RMP original questions

NO.17 Tom is the project manager for his organization. In his project he has recently finished the risk
response planning. He tells his manager that he will now need to update the cost and schedule baselines.
Why would the risk response planning cause Tom the need to update the cost and schedule baselines?
A. New or omitted work as part of a risk response can cause changes to the cost and/or schedule
baseline.
B. Risk responses protect the time and investment of the project.
C. Risk responses may take time and money to implement.
D. Baselines should not be updated, but refined through versions.
Answer: A

PMI   PMI-RMP exam prep   PMI-RMP

NO.18 You are the project manager of the KJH Project and are working with your project team to plan the risk
responses. Consider that your project has a budget of $500,000 and is expected to last six months. Within
the KJH Project you have identified a risk event that has a probability of .70 and has a cost impact of
$350,000. When it comes to creating a risk response for this event what is the risk exposure of the event
that must be considered for the cost of the risk response?
A. The risk exposure of the event is $245,000.
B. The risk exposure of the event is $500,000.
C. The risk exposure of the event is $350,000.
D. The risk exposure of the event is $850,000.
Answer: A

PMI   PMI-RMP   PMI-RMP

NO.19 Shelly is the project manager of the BUF project for her company. In this project Shelly needs to
establish some rules to reduce the influence of risk bias during the qualitative risk analysis process. What
method can Shelly take to best reduce the influence of risk bias?
A. Group stakeholders according to positive and negative stakeholders and then complete the risk
analysis
B. Determine the risk root cause rather than the person identifying the risk events
C. Establish risk boundaries
D. Establish definitions of the level of probability and impact of risk event
Answer: D

PMI   PMI-RMP   PMI-RMP   PMI-RMP   PMI-RMP   PMI-RMP answers real questions

NO.20 Your organization has named you the project manager of the JKN Project. This project has a BAC of
$1,500,000 and it is expected to last 18 months. Management has agreed that if the schedule baseline
has a variance of more than five percent then you will need to crash the project. What happens when the
project manager crashes a project?
A. Project risks will increase.
B. The project will take longer to complete, but risks will diminish.
C. Project costs will increase.
D. The amount of hours a resource can be used will diminish.
Answer: C

PMI answers real questions   PMI-RMP   PMI-RMP practice test   PMI-RMP pdf   PMI-RMP   PMI-RMP demo

NO.21 Which risk response is acceptable for both positive and negative risk events?
A. Transferring
B. Acceptance
C. Sharing
D. Enhancing
Answer: B

PMI braindump   PMI-RMP pdf   PMI-RMP braindump   PMI-RMP   PMI-RMP exam

NO.22 Jenny is the project manager of the NHJ Project for her company. She has identified several positive
risk events within the project and she thinks these events can save the project time and money. You, a
new team member wants to know that how many risk responses are available for a positive risk event.
What will Jenny reply to you?
A. Four
B. Three
C. Seven
D. Acceptance is the only risk response for positive risk events.
Answer: A

PMI braindump   PMI-RMP study guide   PMI-RMP test

NO.23 You are the project manager of the NHJ project for your company. This project has a budget at
completion of $1,650,000 and you are 60 percent complete. According to the project plan, however, the
project should be 65 percent complete. In this project you have spent $995,000 to reach this point of
completion. There is a risk that this project may be late so you have taken some measures to recover the
project schedule. Management would like to know, based on current performance, what the estimate at
completion for this project will be. What is the estimate at completion?
A. $1,650,000
B. $1,666,667
C. $663,333
D. -$8,333
Answer: B

PMI pdf   PMI-RMP test answers   PMI-RMP

NO.24 John is the project manager of the NHQ Project for his company. His project has 75 stakeholders,
some of which are external to the organization. John needs to make certain that he communicates about
risk in the most appropriate method for the external stakeholders. Which project management plan will be
the best guide for John to communicate to the external stakeholders?
A. Risk Response Plan
B. Risk Management Plan
C. Communications Management Plan
D. Project Management Plan
Answer: C

PMI   PMI-RMP   PMI-RMP   PMI-RMP demo

NO.25 You work as the project manager for Bluewell Inc. Your project has several risks that will affect several
stakeholder requirements. Which project management plan will define who will be available to share
information on the project risks?
A. Risk Management Plan
B. Stakeholder management strategy
C. Resource Management Plan
D. Communications Management Plan
Answer: D

PMI original questions   PMI-RMP braindump   PMI-RMP   PMI-RMP practice test   PMI-RMP   PMI-RMP

NO.26 What risk identification technique allows participants to identify the project risks and to remain
anonymous?
A. Influence diagrams
B. Assumptions analysis
C. Surveys
D. Delphi technique
Answer: D

PMI pdf   PMI-RMP   PMI-RMP braindump   PMI-RMP exam prep   PMI-RMP exam prep

NO.27 There are five outputs of the risk monitoring and controlling process. Which one of the following is NOT
an output of the process?
A. Organizational process assetsupdates
B. Risk register updates
C. Vendor contracts
D. Change requests
Answer: C

PMI study guide   PMI-RMP   PMI-RMP   PMI-RMP

NO.28 You are the project manager of the NHQ Project for your company. You have completed qualitative and
quantitative analysis of your identified project risks and you would now like to find an approach to increase
project opportunities and to reduce threats within the project. What project management process would
best help you?
A. Monitor and control project risks
B. Create a risk governance approach
C. Create the project risk register
D. Plan risk responses
Answer: D

PMI dumps   PMI-RMP   PMI-RMP test answers   PMI-RMP certification

NO.29 Examine the figure given below.
What will be the expected monetary value of Risk C?
A. -$113,750
B. $175,000 if the risk event actually happens
C. -$175,000
D. -$27,000
Answer: D

PMI pdf   PMI-RMP   PMI-RMP questions   PMI-RMP test questions   PMI-RMP practice test   PMI-RMP

NO.30 You are the project manager of the GYH project for your organization. Management has asked you to
begin identifying risks and to use an information gathering technique. Which one of the following risk
identification approaches is an information gathering technique?
A. Root cause analysis
B. Assumptions analysis
C. SWOT analysis
D. Documentation reviews
Answer: A

PMI braindump   PMI-RMP   PMI-RMP study guide   PMI-RMP test answers   PMI-RMP

Pass4Test offer the latest 100-101 exam material and high-quality JK0-U11 pdf questions & answers. Our 1Z0-536 VCE testing engine and 00M-670 study guide can help you pass the real exam. High-quality HP2-N40 dumps training materials can 100% guarantee you pass the exam faster and easier. Pass the exam to obtain certification is so simple.

Article Link: http://www.pass4test.com/PMI-RMP.html

2013年6月13日星期四

PMI PMI-RMP exam practice questions and answers

If you think you can face unique challenges in your career, you should pass the PMI PMI-RMP exam. Pass4Test is a site that comprehensively understand the PMI PMI-RMP exam. Using our exclusive online PMI PMI-RMP exam questions and answers, will become very easy to pass the exam. Pass4Test guarantee 100% success. Pass4Test is recognized as the leader of a professional certification exam, it provides the most comprehensive certification standard industry training methods. You will find that Pass4Test PMI PMI-RMP exam questions and answers are most thorough and the most accurate questions on the market and up-to-date practice test. When you have Pass4Test PMI PMI-RMP questions and answers, it will allow you to have confidence in passing the exam the first time.


As long as you need the exam, we can update the PMI certification PMI-RMP exam training materials to meet your examination needs. Pass4Test's training materials contain many practice questions and answers about PMI PMI-RMP and they can 100% ensure you pass PMI PMI-RMP exam. With the training materials we provide, you can take a better preparation for the exam. And we will also provide you a year free update service.


If you buy Pass4Test PMI PMI-RMP exam training materials, you will solve the problem of your test preparation. You will get the training materials which have the highest quality. Buy our products today, and you will open a new door, and you will get a better future. We can make you pay a minimum of effort to get the greatest success.


Take advantage of the Pass4Test's PMI training materials to prepare for the exam, let me feel that the exam have never so easy to pass. This is someone who passed the examination said to us. With Pass4Test PMI PMI-RMP exam certification training, you can sort out your messy thoughts, and no longer twitchy for the exam. Pass4Test have some questions and answers provided free of charge as a trial. If I just said, you may be not believe that. But as long as you use the trial version, you will believe what I say. You will know the effect of this exam materials.


Each IT certification exam candidate know this certification related to the major shift in their lives. Certification exam training materials Pass4Test provided with ultra-low price and high quality immersive questions and answersdedication to the majority of candidates. Our products have a cost-effective, and provide one year free update . Our certification training materials are all readily available. Our website is a leading supplier of the answers to dump. We have the latest and most accurate certification exam training materials what you need.


I believe that people want to have good prospects of career whatever industry they work in. Of course, there is no exception in the competitive IT industry. IT Professionals working in the IT area also want to have good opportunities for promotion of job and salary. A lot of IT professional know that PMI certification PMI-RMP exam can help you meet these aspirations. Pass4Test is a website which help you successfully pass PMI PMI-RMP.


Pass4Test promise that we will spare no effort to help you pass PMI certification PMI-RMP exam. Now you can free download part of practice questions and answers of PMI certification PMI-RMP exam on Pass4Test. When you select Pass4Test, you can not only pass PMI certification PMI-RMP exam, but also have one year free update service. Pass4Test can also promise if you fail to pass the exam, Pass4Test will 100% refund.


Exam Code: PMI-RMP

Exam Name: PMI (PMI Risk Management Professional)

PMI-RMP Free Demo Download: http://www.pass4test.com/PMI-RMP.html


NO.1 You are the project manager of the GHE Project. You have identified the following risks with the
characteristics as shown in the following figure: How much capital should the project set aside for the risk
contingency reserve?
A. $142,000
B. $41,750
C. $23,750
D. $232,000
Answer: C

PMI   PMI-RMP exam simulations   PMI-RMP exam simulations   PMI-RMP braindump

NO.2 You are project manager for ABD project. You, with your team, are working on the following activities:
Probabilistic analysis of a project.
Probability of achieving cost and time objectives.
Trends in Qualitative Risk Analysis results.
On which of the following processes are you working on?
A. Plan Risk Management
B. Perform Quantitative Risk Analysis
C. Perform Qualitative Risk Analysis
D. Identify Risks
Answer: B

PMI braindump   PMI-RMP certification training   PMI-RMP   PMI-RMP study guide   PMI-RMP

NO.3 You are the project manager of the GYH project for your organization. Management has asked you to
begin identifying risks and to use an information gathering technique. Which one of the following risk
identification approaches is an information gathering technique?
A. Root cause analysis
B. Assumptions analysis
C. SWOT analysis
D. Documentation reviews
Answer: A

PMI   PMI-RMP   PMI-RMP   PMI-RMP exam dumps

NO.4 Kelly is the project manager of the BHH project for her organization. She is completing the risk
identification process for this portion of her project. Which one of the following is the only thing that the
risk identification process will create for Kelly?
A. Risk register
B. Risk register updates
C. Change requests
D. Project document updates
Answer: A

PMI   PMI-RMP   PMI-RMP   PMI-RMP   PMI-RMP certification   PMI-RMP pdf

NO.5 You are working with Anna on your project to determine and map the probability distributions of risk
within the project. You have indicated that you will use the uniform distribution method for a portion of the
project. Which part of your project is most likely to have a uniform risk distribution?
A. Late completion stages of a project
B. Project phases that deal with "cutover" technologies
C. Early concept stage of design
D. Project initiating
Answer: C

PMI   PMI-RMP test   PMI-RMP   PMI-RMP

NO.6 You work as a project manager for BlueWell Inc. You want to create a visual diagram, which can depict
the resources that will be used within the project. Which of the following diagrams will you create to
accomplish the task?
A. Roles and responsibility matrix
B. Work breakdown structure
C. Resource breakdown structure
D. RACI chart
Answer: C

PMI   PMI-RMP original questions   PMI-RMP braindump   PMI-RMP test   PMI-RMP exam dumps   PMI-RMP dumps

NO.7 You are preparing to start the qualitative risk analysis process for your project. You will be relying on
some organizational process assets to influence the process. Which one of the following is NOT a
probable reason for relying on organizational process assets as an input for qualitative risk analysis?
A. Studies of similar projects by risk specialists
B. Risk databases that may be available from industry sources
C. Review of vendor contracts to examine risks in past projects
D. Information on prior, similar projects
Answer: C

PMI   PMI-RMP exam prep   PMI-RMP   PMI-RMP practice test

NO.8 Lisa is the project manager of the SQL project for her company. She has completed the risk response
planning with her project team and is now ready to update the risk register to reflect the risk response.
Which of the following statements best describes the level of detail Lisa should include with the risk
responses she has created?
A. The level of detail is set by historical information.
B. The level of detail should correspond with the priority ranking.
C. The level of detail must define exactly the risk response for each identified risk.
D. The level of detail is set of project risk governance.
Answer: B

PMI certification training   PMI-RMP   PMI-RMP

NO.9 Examine the figure given below.
What will be the expected monetary value of Risk C?
A. -$113,750
B. $175,000 if the risk event actually happens
C. -$175,000
D. -$27,000
Answer: D

PMI   PMI-RMP   PMI-RMP practice test

NO.10 You are the project manager of the KJH Project and are working with your project team to plan the risk
responses. Consider that your project has a budget of $500,000 and is expected to last six months. Within
the KJH Project you have identified a risk event that has a probability of .70 and has a cost impact of
$350,000. When it comes to creating a risk response for this event what is the risk exposure of the event
that must be considered for the cost of the risk response?
A. The risk exposure of the event is $245,000.
B. The risk exposure of the event is $500,000.
C. The risk exposure of the event is $350,000.
D. The risk exposure of the event is $850,000.
Answer: A

PMI   PMI-RMP pdf   PMI-RMP   PMI-RMP

NO.11 Tracy is the project manager of the NLT Project for her company. The NLT Project is scheduled to last
14 months and has a budget at completion of $4,555,000. Tracy's organization will receive a bonus of
$80,000 per day that the project is completed early up to $800,000. Tracy realizes that there are several
opportunities within the project to save on time by crashing the project work. Crashing the project is what
type of risk response?
A. Transference
B. Mitigation
C. Exploit
D. Enhance
Answer: D

PMI test answers   PMI-RMP answers real questions   PMI-RMP   PMI-RMP

NO.12 Your organization has named you the project manager of the JKN Project. This project has a BAC of
$1,500,000 and it is expected to last 18 months. Management has agreed that if the schedule baseline
has a variance of more than five percent then you will need to crash the project. What happens when the
project manager crashes a project?
A. Project risks will increase.
B. The project will take longer to complete, but risks will diminish.
C. Project costs will increase.
D. The amount of hours a resource can be used will diminish.
Answer: C

PMI original questions   PMI-RMP   PMI-RMP exam   PMI-RMP exam simulations

NO.13 Virginia is the project manager for her organization. She has hired a subject matter expert to interview
the project stakeholders on certain identified risks within the project. The subject matter expert will assess
the risk event with what specific goal in mind?
A. To determine the level of probability and impact for each risk event
B. To determine the bias of the risk event based on each person interviewed
C. To determine the probability and cost of the risk event
D. To determine the validity of each risk event
Answer: A

PMI   PMI-RMP study guide   PMI-RMP demo

NO.14 Tom is the project manager for his organization. In his project he has recently finished the risk
response planning. He tells his manager that he will now need to update the cost and schedule baselines.
Why would the risk response planning cause Tom the need to update the cost and schedule baselines?
A. New or omitted work as part of a risk response can cause changes to the cost and/or schedule
baseline.
B. Risk responses protect the time and investment of the project.
C. Risk responses may take time and money to implement.
D. Baselines should not be updated, but refined through versions.
Answer: A

PMI original questions   PMI-RMP exam   PMI-RMP test answers   PMI-RMP test answers   PMI-RMP

NO.15 What risk identification technique allows participants to identify the project risks and to remain
anonymous?
A. Influence diagrams
B. Assumptions analysis
C. Surveys
D. Delphi technique
Answer: D

PMI test answers   PMI-RMP braindump   PMI-RMP exam   PMI-RMP test questions   PMI-RMP   PMI-RMP

NO.16 Frank is the project manager of the NHQ project for his company. Frank is working with the project
team, key stakeholders, and several subject matter experts on risks dealing with the new materials in the
project. Frank wants to utilize a risk analysis method that will help the team to make decisions in the
presence of the current uncertainty surrounding the new materials. Which risk analysis approach can
Frank use to create an approach to make decisions in the presence of uncertainty?
A. Monte Carlo Technique
B. Qualitative risk analysis process
C. Quantitative risk analysis process
D. Delphi Technique
Answer: C

PMI exam simulations   PMI-RMP certification   PMI-RMP dumps   PMI-RMP   PMI-RMP

NO.17 You are the project manager of the NHJ project for your company. This project has a budget at
completion of $1,650,000 and you are 60 percent complete. According to the project plan, however, the
project should be 65 percent complete. In this project you have spent $995,000 to reach this point of
completion. There is a risk that this project may be late so you have taken some measures to recover the
project schedule. Management would like to know, based on current performance, what the estimate at
completion for this project will be. What is the estimate at completion?
A. $1,650,000
B. $1,666,667
C. $663,333
D. -$8,333
Answer: B

PMI test questions   PMI-RMP   PMI-RMP demo   PMI-RMP exam dumps

NO.18 You are the project manager of the NHQ Project for your company. You have completed qualitative and
quantitative analysis of your identified project risks and you would now like to find an approach to increase
project opportunities and to reduce threats within the project. What project management process would
best help you?
A. Monitor and control project risks
B. Create a risk governance approach
C. Create the project risk register
D. Plan risk responses
Answer: D

PMI dumps   PMI-RMP   PMI-RMP

NO.19 You work as the project manager for Bluewell Inc. Your project has several risks that will affect several
stakeholder requirements. Which project management plan will define who will be available to share
information on the project risks?
A. Risk Management Plan
B. Stakeholder management strategy
C. Resource Management Plan
D. Communications Management Plan
Answer: D

PMI   PMI-RMP test questions   PMI-RMP   PMI-RMP   PMI-RMP answers real questions

NO.20 You are a risk auditor for your company. You are reviewing the contract types a project manager has
used in her project. Of the following, which contract type has the most risk for the project manager as a
buyer?
A. Cost plus percentage of costs
B. Time and material
C. Cost plus incentive fee
D. Fixed-price, incentive fee
Answer: A

PMI exam simulations   PMI-RMP original questions   PMI-RMP   PMI-RMP

NO.21 Sammy is the project manager for her organization. She would like to rate each risk based on its
probability and affect on time, cost, and scope. Harry, a project team member, has never done this before
and thinks Sammy is wrong to attempt this approach. Harry says that an accumulative risk score should
be created, not three separate risk scores. Who is correct in this scenario?
A. Harry is correct, because the risk probability and impact considers all objectives of the project.
B. Harry iscorrect, the risk probability and impact matrix is the only approach to risk assessment.
C. Sammy is correct, because organizations can create risk scores for each objective of the project.
D. Sammy is correct, because she is the project manager.
Answer: C

PMI   PMI-RMP   PMI-RMP dumps

NO.22 Shelly is the project manager of the BUF project for her company. In this project Shelly needs to
establish some rules to reduce the influence of risk bias during the qualitative risk analysis process. What
method can Shelly take to best reduce the influence of risk bias?
A. Group stakeholders according to positive and negative stakeholders and then complete the risk
analysis
B. Determine the risk root cause rather than the person identifying the risk events
C. Establish risk boundaries
D. Establish definitions of the level of probability and impact of risk event
Answer: D

PMI dumps   PMI-RMP exam dumps   PMI-RMP

NO.23 Jenny is the project manager of the NHJ Project for her company. She has identified several positive
risk events within the project and she thinks these events can save the project time and money. You, a
new team member wants to know that how many risk responses are available for a positive risk event.
What will Jenny reply to you?
A. Four
B. Three
C. Seven
D. Acceptance is the only risk response for positive risk events.
Answer: A

PMI   PMI-RMP exam dumps   PMI-RMP   PMI-RMP dumps   PMI-RMP   PMI-RMP

NO.24 John is the project manager of the NHQ Project for his company. His project has 75 stakeholders,
some of which are external to the organization. John needs to make certain that he communicates about
risk in the most appropriate method for the external stakeholders. Which project management plan will be
the best guide for John to communicate to the external stakeholders?
A. Risk Response Plan
B. Risk Management Plan
C. Communications Management Plan
D. Project Management Plan
Answer: C

PMI   PMI-RMP pdf   PMI-RMP

NO.25 You work as a project manager for BlueWell Inc. Your project is using a new material to construct a large
warehouse in your city. This new material is cheaper than traditional building materials, but it takes some
time to learn how to use the material properly. You have communicated to the project stakeholders that
you will be able to save costs by using the new material, but you will need a few extra weeks to complete
training to use the materials. This risk response of learning how to use the new materials can also be
known as what term?
A. Team development
B. Benchmarking
C. Cost of conformance to quality
D. Cost-benefits analysis
Answer: C

PMI   PMI-RMP braindump   PMI-RMP questions   PMI-RMP original questions

NO.26 Which risk response is acceptable for both positive and negative risk events?
A. Transferring
B. Acceptance
C. Sharing
D. Enhancing
Answer: B

PMI   PMI-RMP pdf   PMI-RMP exam dumps   PMI-RMP

NO.27 Jenny is the project manager for the NBT projects. She is working with the project team and several
subject matter experts to perform the quantitative risk analysis process. During this process she and the
project team uncover several risks events that were not previously identified. What should Jenny do with
these risk events?
A. The events should be entered into qualitative risk analysis.
B. The events should be determined if they need to be accepted or responded to.
C. The events should be entered into the risk register.
D. The events should continue on with quantitative risk analysis.
Answer: C

PMI certification training   PMI-RMP   PMI-RMP   PMI-RMP   PMI-RMP answers real questions

NO.28 Jane is the project manager of the GBB project for her company. In the current project a vendor has
offered the project a ten percent discount based if they will order 100 units for the project. It is possible
that the GBB Project may need the 100 units, but the cost of the units is not a top priority for the project.
Jane documents the offer and tells the vendor that they will keep the offer in mind and continue with the
project as planned. What risk response has been given in this project?
A. Acceptance
B. Enhance
C. Exploiting
D. Sharing
Answer: A

PMI   PMI-RMP   PMI-RMP   PMI-RMP   PMI-RMP study guide   PMI-RMP

NO.29 There are five outputs of the risk monitoring and controlling process. Which one of the following is NOT
an output of the process?
A. Organizational process assetsupdates
B. Risk register updates
C. Vendor contracts
D. Change requests
Answer: C

PMI answers real questions   PMI-RMP practice test   PMI-RMP   PMI-RMP demo   PMI-RMP

NO.30 John works as a project manager for ABD project. He and his team, are working on the following
activities:
Relative ranking or priority list of project risks
Watchlists of low priority risk
Trends in Qualitative Risk Analysis results
On which of the following processes is John working on?
A. Perform Qualitative Risk Analysis
B. Plan Risk Management
C. Plan Risk Responses
D. Perform Quantitative Risk Analysis
Answer: A

PMI demo   PMI-RMP   PMI-RMP exam prep   PMI-RMP

Pass4Test not only have a high reliability, but also provide a good service. If you choose Pass4Test, but don't pass the exam, we will 100% refund full of your cost to you. Pass4Test also provide you with a free update service for one year.